Construction Schedule

Brighton Construction Schedule

Brighton Construction Schedule for November 9 to 20, 2026 

Below is the anticipated schedule of work from November 9 to 20. 

Brighton High School 

Music Suite: 

  • Punchlist work consisting of door adjustments, drywall work, lighting controls 

Door 20 Addition: 

  • Punchlist work consisting of Ceiling Work 

Hallways: 

  • Painting 

  • Flooring Prep including grinding and moisture mitigation 

  • Speaker Wiring 

Rooms 154/156/Main Lobby/352/354/408 

  • Electrical Rough-In 

  • Foundation Work – Sampling Crusher for Proctor/Compaction 

  • Framing 

Athletic Fields and New Entry Lane: 

  • Soil management plan is set in place. Working with DEC for work approvals. 

  • Soil testing around the site for topsoil analysis – following DEC guidelines 

  • Saw cutting asphalt & Excavation 

  • Conduit Install & Light Pole Base Rough-In 

  • Charging Station Work 

Boiler Room/MDP: 

  • Steel Work 

  • Roofing 

  • Cleaning 

  • Concrete Infills 

  • Controls Programming 

 

Twelve Corners Middle School 

Sitework: 

  • Dumpster Fence & Posts Install 

French Road Elementary School 

Bus Loop/Parking Lot: 

  • Signage Installation 

  • Flag Pole Installation 

Freezer/Cooler Addition: 

  • Flooring 

  • Electrical Finishes 

  • Sump Pump Vent Piping 

Dumpster Enclosure: 

  • Fencing Work 

Boiler Room: 

  • Wall demolition 

  • Electrical disconnections 

Council Rock Primary School 

  • Pre-Abatement Demo (Electrical) - Classrooms 26, 28, and 30 

  • Abatement Demo - Classrooms 26, 28, and 30 

 

Please note that our schedules are always subject to change based on many factors and opportunities including manpower, material availability, and weather. 

Brighton Central School District construction projects will follow the local Town of Brighton Construction Noise Ordinance Hours of 7 a.m. to 7 p.m. Monday through Friday. Please anticipate that there may be varying loud noise between those hours to allow for construction to advance.